He directed to prioritize such projects to create effective system of energy production


Islamabad: Prime Minister Shehbaz Sharif has directed to remove obstacles in the Diamer-Bhasha Dam project and complete it as soon as possible.
A meeting was held under the chairmanship of Shehbaz Sharif on Diamer-Bhasha Dam and other water resources, during which the Prime Minister directed to complete projects like Diamer-Bhasha Dam on a priority basis.
The Prime Minister directed to prioritize such projects to create an effective system of energy production and abundant water storage, and to immediately remove obstacles in the construction of Diamer Bhasha Dam and complete it as soon as possible.
Speaking at the meeting, Shehbaz Sharif said that new dams are indispensable to increase water storage capacity, provide water for agriculture, and prevent floods.
He further said that our economic self-reliance depends on cheap electricity and agriculture. There is a need to increase water storage and use water effectively.

Meta held talks to buy Thinking Machines, Perplexity, and Safe Superintelligence
- 6 hours ago

It’s not just the cities. Extreme heat is a growing threat to rural America.
- 4 hours ago

Microsoft adds Steam games to its Xbox PC app on Windows
- 6 hours ago

Mock draft: Derrick Henry biggest mover in change to non-PPR
- 5 hours ago

28 Years Later is a bleak fever dream with rage pumping through its veins
- 6 hours ago

Riot is shutting down studio behind its Minecraft-like game
- 6 hours ago

Verizon adopts Google’s Gemini AI to help customers solve ‘complex’ issues
- 6 hours ago

The paradox driving Trump’s bad polling numbers
- 4 hours ago

How the Supreme Court paved the way for ICE’s lawlessness
- 4 hours ago

OpenAI and Jony Ive’s ‘io’ brand has vanished, but their AI hardware deal remains
- 6 hours ago

This time, it’s Trump’s war
- 4 hours ago

Three ways Trump’s attack on Iran could spin out of control
- 4 hours ago