There was moderate rain in North Nazimabad, New Karachi, and Orangi Town


Karachi: Today, it rained again in different areas of Karachi. Light and moderate rain in some areas made the weather pleasant. On the other hand, the previous rainwater is still on the roads in the city, while broken roads have made the lives of citizens even more difficult.
According to the details, it rained again in different areas of Karachi on Friday. There was moderate rain in North Nazimabad, New Karachi, and Orangi Town, while the weather around Baldia Town, Site Area, Golimar, and Garden also became pleasant due to rain.
Worsening situation after rain
On the other hand, even after two days since the end of the heavy rains in Karachi, the situation in many areas and on highways could not returned to normal. The roads, squares, intersections, and crossroads of many areas in the city are still presenting a pond scene, while on the other hand, broken roads, potholes, and cracks have made transportation difficult.
The traffic flow is being severely affected due to potholes on both sides of the road going from Pehlawan Goth to Gulistan-e-Johar, while the road coming from Safora to Khawar Chowk on the same road is showing the appearance of a river due to water being drained from the Safora underpass of the BRT.
Meanwhile, due to the construction work of Munawar Chowrangi underpass, potholes have also appeared on the recently laid alternative roads around it after the rain, due to which the traffic movement is severely affected.
Similarly, the main highway in Korangi Industrial Area, while in Scheme 33, Madras Chowk, Gulshan-e-Kaneez Fatima, and the surrounding roads are still waterlogged, while the sewers are overflowing badly. Due to the lack of timely drainage, the traffic flow on the highways is being severely affected. The citizens are facing great difficulties due to the dilapidated roads.
On the other hand, the causeway that had been causing the worst traffic jam in the Korangi area of Karachi for the past two days has been opened for light traffic. The highway from Baloch Colony to Korangi Industrial Area was closed for two days due to the water of the Malir River, which increased the travel time at the Jam Sadiq Bridge. However, the road from Korangi Crossing to Qayyumabad is still closed to traffic due to mud and debris.

Iran’s leader demands crackdown on ‘seditionists’ after protests
- 12 hours ago

The Sony Bravia 8 II is a TV enthusiast’s dream
- 2 hours ago
Pakistan Army spokesperson interacts with students about national and regional situation, army's role in national security
- 14 hours ago

50,000 clandestine Starlink terminals are keeping Iranians in touch with the rest of the world
- 22 minutes ago
From Cooper Flagg to Kevin Durant: Revisiting the stars who left their mark on the Hoophall Classic
- an hour ago
Cloudy weather with chances of rain, light snow expected in KP, GB, Kashmir
- 11 hours ago
Exercise "Inspired Gambit-2026" with Pakistan new dimension in defence ties: US
- 12 hours ago
Bangladesh meet with ICC to request relocation of T20 World Cup matches
- 8 hours ago
Trump invites more leaders to join Gaza ‘Board of Peace’
- 10 hours ago
CM Maryam's son Junaid Safdar weds today
- 13 hours ago
How to bet the CFP National Championship: Double down on discipline
- an hour ago
NBA hopes Grizzlies' Morant plays Sun. in London
- 14 hours ago






